Expert System for Assembly Line Balancing for Multi Product
Abstract
Keywords
Full Text:
PDFReferences
Baybars, I. “A survey of inexact algorithms for the simple assembly line balancing problem”.GSIA WP-64-82-83, Carnegie –Mellon University, Pittsburgh, PA, July 1983 (revised October 1986)
Kusiak A (2000) Computational intelligence in design and manufacturing. Wiley, New York
Daudin, M (2002). Lean assembly: The nuts and bolts of making assembly operations flow. Productivity, New York.
Evans, J.R, (1983), Applied production and Operations Management, West Publishing, New York, 301-330 Jersey, 419-424.
Boysen, N.Fliedner, M., 2006. A versatile algorithm for assembly line balancing. Working paper, University of Hamburg, German.
Bukchin, J., Masin, m., 2004. Multi-objective design of team oriented assembly systems. European journal of Operational Research 156,326-352.
Bukchin , Y., Meller, R.D., 2005. A space allocation algorithm for assembly line components. IIE Transactions 37,51-61.
Amen M., “Cost-oriented assembly line balancing:Model formulations, solution difficulty, upper and lower bounds.” European journal of Operational Research 168, 2006, pp 747-770.
Kilbridge Maurice D. and wester L. Operations research, vol. 10, No.5 (sep-oct., 1962), pp. 626-638.
Moodie, C. L., and H.H Young. (1965). “A Heuristic Method of Assembly Line Balancing for Assumptions of Constant or Variable Work Element Times”. Industrial Engineering 16, 23-29.
Aase G.R., Olson J.R., Schniederjans M.J.,”U-shaped assembly line layouts and their impact on labour productivity: An Experimental study.” European Journal of Operational Research, 156, 2004, pp 698-711.
Baykasoglu, A ., Ozbakir, L., 2006. Stochastic U-line balancing using genetic algorithms. International journal of Advanced Manufacturing technology, doi: 10.1007/s0017-005-0322-4.
Baybars, I. (1986): “A survey of exact algorithms for the simple assembly line balancing problem”. Management Science, Vol. 32, No. 8, pp. 909-932.
Boctor, F.F. (1995): “A Multiple-rule Heuristic for Assembly Line Balancing”. Journal of the Operational Research Society, 46, pp. 62-69.
Amen, M.”Heuristic methods for cost-oriented assembly line balancing: A comparison on solution quality and computing time”. Int. Journal of production economics, vol. 69,225-264, 2001.
Scholl A, Christian B (2006) State-of-the-art exact and heuristic solution procedures for simple assembly line balancing. Eur J Oper Res 168(3):666–693 .
Dar-El, E. M., “Solving Large Single-model Assembly Line Balancing Problem – A comparative Study”, AIIE Transactions, Vol. 7, No 3, (1975), pp. 302-306.
Becker C,scholl A (2006) A survey on problems and methods in generalised assembly line balancing .Eur J Oper Res 168:694-715.
Baudin,M.(2002).Lean assembly :The nuts and bolts of making assembly operations flow.productivity,New York.
Tonge, Fred M, “Summary of a Heuristic Line Balancing Procedure”, Management Science, , v 7, n 1 (1960),pp21-42.
Jackson J.R., “A Computing Procedure for a Line Balancing Problem”, Management Sci., v 2, n 3, (1956), pp 261-272.
St.T. Hackman, H.J. Magazine, T.S. Wee, Fast, effective algorithms for simple assembly line balancing problems, Operations Research 37 (1989) 916}924.
N.R. Reeve, W.H. Thomas, Balancing stochastic assembly lines, AIIE [American Institute of Industrial Engineers] Transactions 5 (1973) 223}229.
Refbacks
- There are currently no refbacks.