Design of Loop Layout with Integrated Batch Scheduling in Flexible Manufacturing System: An Approach of Stochastic Heuristics
Abstract
Keywords
Full Text:
PDFReferences
William W.Luggen (1991) flexible manufacturing cells and systems. Prentice-hall, Inc. A division of Simon &schustes Englewood cliffs, newjersy07632 ISBN 0-13-321738-8.
R.Pannerselvam (2004) Production and Operations Management Prentice-hall,Inc. New Delhi-110 001
Tompkins ja, white ja, bozerya, janchocoJmn (2003) facilities planning. 3rdedn, wiley, New York.
Apple Jm (1977) plant layout and material handling. 3rdedn. The Ronald press co. New York
MIKELL.P.GROOVER (1992) Automation, Production systems and computer-integrated manufacturing. Prentice-Hall Inc. ISBN-0-87692-618-9.
TijenErtay , Da Ruan , UmutRıfatTuzkaya .,“Integrating data envelopment analysis and analytic hierarchy for the facility layout design in manufacturing systems”International Journal of Information Sciences 176 (2006) 237–262,doi:10.1016/j.ins.2004.12.001,2004 Elsevier Inc.
ShahramAriafar, Napsiah Ismail.,“ An improved algorithm for layoutdesign in cellular manufacturing systems” International Journal of Manufacturing system 176 (2006) 237–262, 28 (2009) 132_139doi:10.1016/j.jmsy.2010.06.003, 2010 TheSociety of Manufacturing Engineers. Published by Elsevier Ltd.
R.M. sateeshkumar, p.Ashokan, s.kumanan (2008) design of loop layout. Inflexible manufacturing system using non-traditional optimization technique. Int. J.Adv manufacturing technology (2008) 38:594-599.
Jerald.J, Ashokan.p, Saravanan.R (2006)simultaneous scheduling of parts and AGV in an FMS environment using adaptive genetic algorithm. Int.J.AdvManufacturing technology (2006) 29:584-589.
Xiaodan Wu, Chao-Hsien Chu., “Genetic algorithms for integrating cell formation with machine layout and scheduling” International Journal of Computers & Industrial Engineering 53 (2007) 277–289 doi:10.1016/j.cie.2007.06.021, 2007 Elsevier Ltd.
Semih O nut, Umut R. Tuzkaya., “A particle swarm optimization algorithm for the multiple-level warehouse layout design problem” International Journal of Computers & Industrial Engineering 54 (2008) 783–799 doi:10.1016/j.cie.2007.10.012, 2007 Elsevier Ltd.
Buzaacatt JA, yao DD (1986) flexible manufacturing systems review of analytical models Managsci 32(7); 890-905.
Kimemia J, Gershwin SB (1985) flow optimization in flexible manufacturing system. Int.J.prod Res 23(1):81-96.
Hongbo Liu, Ajith Abraham, CrinaGrosan, Ningning Li, A novel variable neighbourhood particle swarm optimization for multi-objective
flexible job-shop scheduling problems. 2nd International Conference on Digital Information Management(2007).ICDIM-07. Vol 1,138-145.
Refbacks
- There are currently no refbacks.