An EPQ Model with Imperfect Production Process without Derivatives

R. Uthayakumar, M. Rameswari

Abstract


A different approach to obtain the Economic Order Quantity (EOQ) and Economic Production Quantity (EPQ) models with partial backordering and several extensions without taking derivatives is presented.  We use limiting values on a finite planning horizon without reference to the use of derivatives, neither for necessary conditions nor for second order sufficient conditions. Furthermore, the algebraic derivation immediately provided the value of the average cost function in optimum.   An efficient and easy procedure is developed to find the optimal production run length, order quantity, optimal process quality and the optimal fill rate.  Numerical examples are provided to show the solution procedure.


Keywords


Inventory, EOQ and EPQ, Partial Backordering, An Algebraic Method.

Full Text:

PDF

References


R.W. Grubbstrom, “ Material requirements planning and manufacturing resource planning, International encyclopedia of Business and Management, 1996, pp. 3400 - 3420.

R.W. Grubbstrom, A. Erdem, The EOQ with backlogging derived without derivatives, International Journal of Production Economics, vol.59, 1999, pp. 529 - 530.

L.E. Cardenas - Barron, “The economic production quantity (EPQ) with shortage derived algebraically”, International Journal of Production Economics, vol.70, 2001, pp. 289 - 292.

R.W. Grubbstrm, “Modelling production opportunities an historical overview”, Int. J. Prod. Econ. Vol. 41, (1995) 114. 12

R.W. Grubbstrm, “Material requirements planning and manufacturing resource planning”, in: M. Warner (Ed.), International Encyclopedia of Business and Management, Routledge, London, 1996.

R.W. Grubbstrm, A. Erdem, “The EOQ with backlogging derived without derivatives”, Int. J. Prod. Econ. 59 (13) (1999) 529530.

L.E. Crdenas-Barrn, “The economic production quantity without backlogging derived with algebra, in: Sixth International Conference of the Decision Sciences Institute, Chihuahua, Mxico, 2001.

L.E. Crdenas-Barrn, “The economic production quantity (EPQ) with shortage derived algebraically”, Int. J. Prod. Econ. 70 (3) (2001) 289292.

L.E. Crdenas-Barrn, “Optimal manufacturing batch size with rework in a single-stage production system a simple derivation”, Comput. Ind. Eng. 55 (4) (2008) 758765.

L.E. Crdenas-Barrn, Aplicacin dellgebra a la teora de inventarios, in: The 33rd Research Congress of Tecnolgico de Monterrey, Monterrey, Mxico, 2003, pp. 320325.

G.P. Sphicas, EOQ and EPQ with linear and fixed backorder costs, Two cases identified and models analyzed without calculus, International Journal of Production Economics, 100 (2006) 59 - 64.

R. Ronald, G.K. Yang, and P. Chu, The EOQ and EPQ models with shortages derived without derivatives, International Journal of Production Economics, 92, (2004) 197- 200.

S.K.J. Chang, J.P.C. Chuang, H.J. Chen, The EOQ and EPQ models with shortages derived without derivatives, International Journal of Production Economics, 97 (2005) 241 - 243.

H.M. Wee, S.L. Chung, P.C. Yang, A modified EOQ model with temporary sale price derived without derivatives. The Engineering Economist, 48 (2003) 190 - 195.

K.S. Wu., L.Y. Ouyang, An integrated single vendor, Single buyer inventory system with shortage derived algebraically, Production planning and control, 14 (2003) 555 - 561.

S. Minner, A note on how to compute economic order quantities without derivatives by cost comparisons, International Journal of Production Economics, 105 (2007) 293 - 296.

J. Li, S. Wang, T.C.E. Cheng, Analysis of postponement strategy by EPQ based models with planned backorders, Omega, 36 (2008) 777 - 788.

D.W. Pentico, M.J. Drake, The deterministic EOQ with partial backordering; a new approach, European Journal of Operational Research 2008: in press.

H.M. Wee, W.T. Wang, C.J. Chung, A modified method to compute economic order quantities without derivatives by cost-difference comparisons, European Journal of Operational Research, 2008: in press.

K.N.F. Leung, Using the complete squares method to analyze a lot size model when the quantity backordered and the quantity received are both uncertain, Eur. J. Oper. Res. 187 (1) (2008) 19 - 30.

K.N.F. Leung, Technical note: a use of the complete squares method to solve and analyze a quadratic objective function with two decision variables exemplified via a deterministic inventory model with a mixture of backorders and lost sales, Int. J. Prod. Econ. 113 (1) (2008) 275-281.

K.N.F. Leung, Optimal production lot sizing with backlogging, random defective rate, and rework derived without derivatives, Proc. I MECH E Part B. J. Eng. Manuf. 223 (8) (2009) 1081-1084.

D.W. Pentico, M.J. Drake, The deterministic EPQ with partial backordering; A new approach, Omega, 37 (2009) 624 - 636.

Y.P. Chiu, Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging, Eng. Optim. 35 (4) (2003) 427- 437.

S.W. Chiu, C.B. Cheng, M.F. Wu, J.C. Yang, An algebraic approach for determining the optimal lot size for EPQ model with rework process, Math. Comput. Appl. 15 (3) (2010) 364-370.


Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution 3.0 License.