Open Access Open Access  Restricted Access Subscription or Fee Access

Optimization of Base Stock Level Inventory System and Performance Indicators to Improve Customer Satisfaction in the Six Sigma Environment

A. Kumaravadivel, A. Pandianathan, NG. Dhinesh

Abstract


The main objective of this study was to measure the performances after implementation of innovative inventory management system in a stochastic environment and it was carried out in a casting company which currently implementing the six sigma concept towards achieving the product quality, on time delivery and customer satisfaction at the least cost. The main objectives of this proposed approach is to maintain the stock more economically and at the same time, it should be able to meet the demand. Sometimes, the demand may be more and the stock may not be able to meet demand, then the company will lose the profit and also the good will. In solving most of the real life problems, techniques of Applied Mathematics play a vital role. If the solution does not offer the sufficient amount of accuracy, then it is reformulated and solved. This iterative process is repeated until the exact solution is found. Maintaining optimal inventory and forecasting future demand are not easy for the decision maker of any enterprise. However, it is possible to strike a balance between the ideal zero inventory and the real-world avoidance of stock out costs through a minimum inventory system called Base Stock System. The study has examined the Performance Indicators (PIs) in order to assess the effectiveness and efficiency of the implementation of the six sigma system. This paper proposes a generalized approach for determining the Optimal Base Stock Level to forecast stochastic demand and improve the on time delivery and in turn, improve the efficiency of the process.

Keywords


Base Stock System, Six Sigma, Just-In-Time, Forecasting Demand, Inventory, Customer Satisfaction, Process Performance.

Full Text:

PDF

References


Chakravorty, S.S. (2009) „Six Sigma programs: an implementation model‟, Int. J. Production Economics, Vol. 119, No. 1, pp.1–16

Gaver Jr., D.P. (1959) „On base-stock level inventory control‟, Operations Research, Vol. 7, No.6, pp.689–703.

Johansen, S.G. and Thorstenson, A. (2008) „Optimal base-stock policy for the inventory system with periodic review, backorders and sequential lead times‟, Int. J. Inventory Research, Vol. 1, No. 1, pp.44–52.

Thangaraj, V. and Ramanarayanan, R. (1983) „An operating policy in inventory systems withleadtimes and unit demands‟, Mathematische Operations forschung und Statistik. Series Optimization, Vol. 14, No. 1, pp.2–

Ramanarayan, R., Ramachandran, V. and Sathiyamoorthi, R. (1988) „Base stock system forpatient customers when inter arrival times of demands are independent‟, Advances in Space Research, Vol. 2, No. 7. pp.1–6.

Ahmad, M.M. and Dhafr, N. (2002) „Establishing and improving manufacturing performance measures‟, Robotics and Computer-Integrated Manufacturing, Vol. 18, No. 4, pp.171–176.

Sharma,J.R. (2011) „Linking voice of customer to product development through quality function deployment (QFD)‟, International Journal of Advanced Operations Management, Vol.3, No.1, pp. 19 - 39.

Mackelprang, A.W. and Nair, A. (2010) „Relationship between just-in- time manufacturing practices and performance: a meta-analytic investigation‟, Journal of Operations Management, Vol. 28, No. 9, pp.283–302.

Ahmed, S., Hassan, M.H. and Fen, Y.H. (2005) „Performance measurement and evaluation in an innovative modern manufacturing system‟, Journal of Applied Science, Vol. 5, No. 2,pp.385–401.


Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution 3.0 License.